Pyratyn town. Warehouses. Laying out a 2-layer roof felt covering.
Routine repairs of the roof of the warehouse with a total area of more than 2000 sqm.
DESCRIPTION
New, two-layer coating of the roof surface with rolled bitumen-polymer materials on a polyester basis.
The terms of the repair work are 15 working days.
The warranty period of service is 5 years.
WHAT PROJECTS HAVE BEEN COMPLETED:
- Cleaning and dismantling of damaged areas of the roof covering. Surface preparation.
- Installation of additional and repair of old drainage systems.
- Installation for additional deflection locally, in some places.
- Fusion of the first, backing layer of waterproofing material.
- Fusion of the upper layer of armor with a waterproofing material.
- Repair of roof abutments with parapets and ventilation shafts.
- Installation of weather vane.
FREE
Consulting with our engineer
Fill out the form and our engineer will contact you shortly.
Fill out the form and our engineer will contact you shortly.